Project: 2x20 kW grid connected installation in Kokkina Magnesia

The third installation by Klimax was realized in a private owned lot in Kokkina, Magnesia. The modules are Suntech 180W and the inverters Kaco Powador 6650xi.

The installation uses a 1+1-axis tracking system, by Lorentz ETATRACK 1500A.

The installation is in progress and will be delivered in September 2010.